Home > Projects > Multiple Solar Piling drilling rigs + high-pressure air compressors shipped to a Solar project in Saudi Arabia

Multiple Solar Piling drilling rigs + high-pressure air compressors shipped to a Solar project in Saudi Arabia

Address
Saudi Arabia
Depth
10m
Device
MWGF-618 Drill Rig +31m³/min @ 25bar Screw Air Compressor
Diameter
90-400mm
Share:

Project Background

Saudi Arabia has been making significant strides in the solar photovoltaic (PV) sector in recent years. Under the “Vision 2030” initiative, the national renewable energy target is set at 130 GW, with approximately 7.8 GW of new PV capacity added in 2025 alone. For large-scale PV power plants—ranging from ground-mounted stations to desert PV arrays—the first step in construction is pile driving: hundreds or even thousands of pile holes are drilled to anchor the foundations of the PV mounting structures.

The geology of PV sites in Saudi Arabia is generally challenging to work with: the surface consists of loose desert sand, with hard limestone directly beneath. Traditional augers tend to get stuck in the rock layers, while standard drilling rigs can get bogged down in the soft sand. Therefore, contractors building PV pile foundations generally rely on down-the-hole hammers paired with high-pressure air compressors. Furthermore, the drilling rigs themselves must be modified for desert conditions to ensure fast drilling in hard strata without delaying the project schedule.

This time, a contractor specializing in photovoltaic pile foundations placed an order directly with us for a complete set: 5 photovoltaic drilling rigs, 5 high-pressure air compressors, plus all the accessories and spare parts needed on-site—all delivered in one go.

Technical Requirements Assessment

We have tailored this solution to actual operating conditions rather than rigidly applying specifications from a product catalog. The main considerations are as follows:

Geology: Desert sand + hard limestone—the most common conditions at solar power sites in Saudi Arabia

Process: Down-the-hole hammer drilling, powered by a high-air-pressure compressor

Boreholes: Typical industry specifications for PV pile holes are a diameter of 300–400 mm and a depth of 2–4 meters (shallow holes with large diameters)

Ground Conditions: Soft desert sand; the drill rig requires wider tracks to prevent sinking

Efficiency: With a large number of piles and a tight schedule, drilling speed must be sufficiently fast

Ready-to-Use: Equipment must be operational upon arrival; there can be no delays waiting for spare parts.

Name Specifications
Typical Photovoltaic Borehole Drilling diameter 300–400mm × depth 2–4m
Drill Rig Bore Diameter Range 90–400mm
Drill Rig Drilling Depth ≤10米
Drilling Method DTH Drilling
Engine Power 75.5 kW
Air Compressor 31m³/min @ 25bar

Customization for Saudi Arabian Operating Conditions

This batch of solar-powered drilling rigs is not standard equipment; they were specifically modified for this job site based on our proven modular down-the-hole drilling rig platform:

Larger rotary head + high-torque five-star rotary motor: When drilling large-diameter holes of 300–400 mm, sufficient torque is required to prevent the drill bit from jamming—this is the most notable difference compared to ordinary full-hole drilling rigs.

Wider tracks: These reduce ground pressure, preventing the rig from sinking into soft desert sand during operation.

Paired with a 25 bar high-pressure air compressor: The 25 bar high air pressure ensures the down-the-hole hammer maintains full impact force in limestone and cemented sand layers, resulting in clean, precise drilling without the need to repeatedly grind the bit in the same meter.

Specification
Customized Solar Drilling Rig Diameter: 90-400mm,
Depth: 10m,
75.5 kW engine;
High-torque five-star rotary motor;
Wide desert tracks
Bigger Radiator
High Pressure Screw Air Compressor 31m³/min @ 25bar
Drill Tools Selection for Hard Limestone
Spare Parts Filter elements, seals, wear parts, tools

Turnkey Delivery—Ready to Use Upon Arrival

Every unit in this shipment leaves the factory ready for immediate operation: drilling rigs, air compressors, drilling tools, consumables, and spare parts kits are all fully included, so customers don’t have to piece things together locally.

The first batch was loaded and shipped yesterday and is currently en route to the port or freight forwarder’s warehouse; the remaining equipment will follow as scheduled, ensuring no impact on on-site pile driving progress.

Why This Configuration?

Solar power construction sites in Saudi Arabia feature hard ground and tight schedules. If the drill rig is not properly matched with the air compressor, drilling speed will be compromised; if the air compressor is not properly matched with the drill bit, the noise level will increase without necessarily improving speed. Only when the drill rig, air compressor, drilling tools, and spare parts are matched as a complete set can a single supplier resolve all issues in one go.

This is exactly the kind of integration we provide: we deliver drill rigs, high-air-pressure compressors, drilling tools, and spare parts as a perfectly matched package. For contractors working on solar PV pile foundations in Saudi Arabia, having one fewer supplier and one fewer coordination step means they can start work the very day the equipment arrives on-site.

Contact Us

Tell us your borehole diameter, depth, geological conditions, and project timeline, and we’ll provide you with a customized solar PV pile driving solution.

Email: social@dminingwell.com | WhatsApp: +86 137 3250 4892